7 products
- Please enter a valid length in CM.
About this range
Timber gable infill
Seven infill designs, GI1 through GI7, cut in our Bayswater workshop and delivered Australia-wide at $293.61.
All are made using 9mm LOSP treated marine ply — marine ply because it is bonded with waterproof glue and has no voids in the core, which is what lets it hold a fine cut pattern in a spot that gets weather from two sides and sun all day.
Our extensive range of gable infills are available to suit any sized gable, as we make them all to order. That is the point: a gable is a triangle defined by a roof pitch nobody standardised, so an infill has to be cut to the one you have rather than the one a catalogue assumed. Other designs are available upon request.
The infill is the panel that fills the triangle under the apex. It is the single most visible piece of decorative timber on a period frontage, and on most houses it is either missing or was replaced with flat sheet at some point.
Send us the pitch and the span, or a photograph with something in frame for scale. See also gable finials for the apex, gable vents, and the full gable products range.
Get in touch, or call the workshop on (03) 9720 7266.
Gable infill panels, gable inserts and gable fretwork: one product
Whatever it is called on the plans, the panel that fills the triangle under the apex is this product. The seven designs, GI1 to GI7, are each from $293.61, cut from 9 mm LOSP treated marine ply, and other patterns are cut on request, including a copy of an infill that is still on the house.
Gable infill ideas: how it sits with the finial and the vent
A gable reads as finished when the three pieces agree. The finial stands on the apex above the infill; the infill fills the triangle below it; a gable vent, where the roof space needs to breathe, is set into the wall under the infill. Turned rosettes from the rosette range finish the ends of the fascia boards. On a Federation house the gable is the place where finials and decorative gable details are expected; on a lych gate, a cubby house or a carport the same infill is cut smaller.
Measuring the triangle
Two things set the size of an infill: the roof pitch and the span. Send both, or send a photograph of the gable taken straight on with something of known size in the frame, and the panel is drawn to the triangle you have rather than the one a catalogue assumes.
Ordering and finishing a gable infill
Marine ply is bonded with waterproof glue and has no voids in the core, which is why it holds a fine cut pattern in a position that gets weather from two sides. It still wants priming on all faces and edges before it goes up, and the coating kept maintained; the care instructions cover it. Cut to order in Bayswater, usually in 2 to 3 weeks and up to 4, and delivered Australia-wide.